Annual Report - Panama Canal Company, Canal Zone Government 1965
The book Annual Report - Panama Canal Company, Canal Zone Government 1965 was written by author Canal Zone Here you can read free online of Annual Report - Panama Canal Company, Canal Zone Government 1965 book, rate and share your impressions in comments. If you don't know what to write, just answer the question: Why is Annual Report - Panama Canal Company, Canal Zone Government 1965 a good or bad book?
What reading level is Annual Report - Panama Canal Company, Canal Zone Government 1965 book?
To quickly assess the difficulty of the text, read a short excerpt:
Liquidated damages, covering 183 days' default, in the amoimt of $91,500, was assessed against the defaulted contract. Locks engineering This continuous engineering program is to provide improvements to locks operations. During the year the Corps of Engineers in Buffalo was invited to inspect the Panama Canal Locks and recommend the feasibility of modernizing the locks control equipment and/or improving the locks operating procedure. An oflBcial report of their recommendations is to be submitte...d. The contract for installation of center wall turntables to turn the new locomo- tives end to end was completed as well as the construction of nine repaii- shelters to be used with the new macliines. In the 24-hour-outage overhaul concept a redesign of the cofferdam became necessary as the result of an unsuccessful attempt at dewatering. Sketches and drawings were prepared to show rising stem and cylindrical valve overhaul schemes. 30 SUPPORTING OPERATIONS Expansion of electrical power system This program, begim in 1961, is designed to provide a system of approxi- mately 100 megawatts by 1980.
You can download books for free in various formats, such as epub, pdf, azw, mobi, txt and others on book networks site. Additionally, the entire text is available for online reading through our e-reader. Our site is not responsible for the performance of third-party products (sites).
User Reviews: