Commonwealth of Massachusetts State Building Code 6th Ed. (1997)
The book Commonwealth of Massachusetts State Building Code 6th Ed. (1997) was written by author Massachusetts State Building Code Commission Here you can read free online of Commonwealth of Massachusetts State Building Code 6th Ed. (1997) book, rate and share your impressions in comments. If you don't know what to write, just answer the question: Why is Commonwealth of Massachusetts State Building Code 6th Ed. (1997) a good or bad book?
What reading level is Commonwealth of Massachusetts State Building Code 6th Ed. (1997) book?
To quickly assess the difficulty of the text, read a short excerpt:
The diameter shall not vary more than 20% from the specified value. 2. Concrete shall not be placed through water except where tremie methods are approved. 3. When depositing concrete from the top of the pile, the concrete flow shall be rapid and continuous, and centered at the top of the pile. 9/19/97 (Effective 2/28/97) - corrected 780 CMR - Sixth Edition 327 780 CMR: STATE BOARD OF BUILDING REGULATIONS AND STANDARDS THE MASSACHUSETTS STATE BUILDING CODE 4. After filling with concrete, the to...p ten feet (3 m) shall be thoroughly rodded. 5. No pile shall be installed within a distance of nine feet (2.7 m) from a pile which has been filled with concrete for less than 12 hours, unless approved. 1820.2 Augered uncased piles: 1820.2.1 Definition: An augered uncased pile is defined as a structural member installed utilizing a hollow-stem auger no less than 12 inches (305 mm) in outside diameter which extends to satisfactory bearing materials to develop support by end bearing and/or friction in those materials.
You can download books for free in various formats, such as epub, pdf, azw, mobi, txt and others on book networks site. Additionally, the entire text is available for online reading through our e-reader. Our site is not responsible for the performance of third-party products (sites).
User Reviews: