Massachusetts Reports : Cases Argued And Determined in the Supreme Judicial Court of Massachusetts 213 (1912-1913)
Massachusetts Reports : Cases Argued And Determined in the Supreme Judicial Court of Massachusetts 213 (1912-1913)
Massachusetts. Supreme Judicial Court
The book Massachusetts Reports : Cases Argued And Determined in the Supreme Judicial Court of Massachusetts 213 (1912-1913) was written by author Massachusetts. Supreme Judicial Court Here you can read free online of Massachusetts Reports : Cases Argued And Determined in the Supreme Judicial Court of Massachusetts 213 (1912-1913) book, rate and share your impressions in comments. If you don't know what to write, just answer the question: Why is Massachusetts Reports : Cases Argued And Determined in the Supreme Judicial Court of Massachusetts 213 (1912-1913) a good or bad book?
What reading level is Massachusetts Reports : Cases Argued And Determined in the Supreme Judicial Court of Massachusetts 213 (1912-1913) book?
To quickly assess the difficulty of the text, read a short excerpt:
LyonSy for the plaintiff. Sheldon, J. The Boston Transit Commission, in accordance with the requirement of St. 1897, c. 500, § 17, constructed a timnel running from Boston proper to East Boston. That section, so far as now material, reads as follows: ''The Boston Transit Commis- sion shall construct a tunnel or timnels, of sufficient size for two railway tracks, with approaches, entrances, sidings, stations and connections therefor, and for the running of railway cars therein, from a point on o...r near Hanover Street in the city of Boston, or such other point or points as said board may deem proper for a suitable connection with the subway or subways provided for" in another statute, "to a point at or near Maverick Square in that part of Boston called East Boston, where a suitable connection with surface tracks may be made. Said tunnel or timnels shall be constructed in a thorough and substantial manner, with special reference to strength, durability and safety for railway travel, and shall be water tight, or in case of leakage the water shall be taken care of by said city." The section then enacts that the tun- nel when completed shall be leased to the defendant.
You can download books for free in various formats, such as epub, pdf, azw, mobi, txt and others on book networks site. Additionally, the entire text is available for online reading through our e-reader. Our site is not responsible for the performance of third-party products (sites).
User Reviews: