Specifications for Sewer Construction Adopted October 8 1914
The book Specifications for Sewer Construction Adopted October 8 1914 was written by author American Society of Municipal Engineers Here you can read free online of Specifications for Sewer Construction Adopted October 8 1914 book, rate and share your impressions in comments. If you don't know what to write, just answer the question: Why is Specifications for Sewer Construction Adopted October 8 1914 a good or bad book?
What reading level is Specifications for Sewer Construction Adopted October 8 1914 book?
To quickly assess the difficulty of the text, read a short excerpt:
Unless otherwise shown on the plan, they shall conform to the following dimensions : Length below cut-off. Minimum dhmeter Minimum diameter at point. At cut-off, inches. Inches. Less than 20 feet 6 10 20 feet to 25 feet 6 11 2G feet to 35 feet 6 12 36 feet to 45 feet 6 13 46 feet and over 6 14 To determine the necessary length of piles to be used in the work, the Contractor may be required to drive test piles. 141. Each pile less than 60 feet long shall be in one piece ; piles longer than 60 fe...et may be spliced in an approved man- 36 ner. The small ends of piles shall be pointed, and, if required, shall be shod with approved iron shoes. The butt ends shall be cut off square and protected while driving with iron bands or caps. How DRIVEN. 142. Piles shall be driven without the use of a follower, unless specially permitted. Pile heads that become split or broomed shall be cut off and the driving continued. Any pile which splits, breaks or drives unsatisfactorily will not be paid for, and it shall be withdrawn or abandoned and another driven in place of it.
User Reviews: