Specifications of Work And Materials Required in the Erection And Completion of a New County Court House, Heating, Lighting And Power Plant And Tunnel in the City of Fort Wayne, Allen County, Indiana
The book Specifications of Work And Materials Required in the Erection And Completion of a New County Court House, Heating, Lighting And Power Plant And Tunnel in the City of Fort Wayne, Allen County, Indiana was written by author Allen County (Ind.). Board of Commissioners Here you can read free online of Specifications of Work And Materials Required in the Erection And Completion of a New County Court House, Heating, Lighting And Power Plant And Tunnel in the City of Fort Wayne, Allen County, Indiana book, rate and share your impressions in comments. If you don't know what to write, just answer the question: Why is Specifications of Work And Materials Required in the Erection And Completion of a New County Court House, Heating, Lighting And Power Plant And Tunnel in the City of Fort Wayne, Allen County, Indiana a good or bad book?
What reading level is Specifications of Work And Materials Required in the Erection And Completion of a New County Court House, Heating, Lighting And Power Plant And Tunnel in the City of Fort Wayne, Allen County, Indiana book?
To quickly assess the difficulty of the text, read a short excerpt:
All floors throughout the entire Court House and Power Station will be mosaic tile, except wiiat is already specified to be of cement. There will be no wood floors in either. The tile to be those manufactured by the Mosaic Tile Co., Zanesville, Ohio, or its equal, to be approved by the Commissioners. The tile to be colored clay, burned to a hardness so that they cannot be scratched by hardened steel, and of a density that the water absorbtion does not exceed three per cent, but to be over one p...er cent., so that the tough clay-like nature has not been superseded by a brittle glass-like structure. 62 SPECIFICATIONS COUNTY COURT HOUSE. The surface of the tile to be crenelated or indented ta afTord a foot hold. The thickness of the tile to be three-quarters of an inch. The designs to be inlaid in the surface of the tile in col- ored clays, penetrating one-eighth of an inch. The designs to be in conformity with the drawings incor- porated in the general plans, and noted thereon. These, however, are subject to change made by the Architect.
Read book Specifications of Work And Materials Required in the Erection And Completion of a New County Court House, Heating, Lighting And Power Plant And Tunnel in the City of Fort Wayne, Allen County, Indiana for free
You can download books for free in various formats, such as epub, pdf, azw, mobi, txt and others on book networks site. Additionally, the entire text is available for online reading through our e-reader. Our site is not responsible for the performance of third-party products (sites).
Claim the "Specifications of work and materials required in the erection and completion of a new county court house, heating, lighting and power plant and tunnel.txt"
User Reviews: