Water And Power Resources Service Project Data, 1981
The book Water And Power Resources Service Project Data, 1981 was written by author United States. Dept. of the Interior. Water And Power Resources Service Here you can read free online of Water And Power Resources Service Project Data, 1981 book, rate and share your impressions in comments. If you don't know what to write, just answer the question: Why is Water And Power Resources Service Project Data, 1981 a good or bad book?
What reading level is Water And Power Resources Service Project Data, 1981 book?
To quickly assess the difficulty of the text, read a short excerpt:
Construction period: 1057-58 Length Capacity (maximum) Typical maximum section in earth: Bottom width Side slopes Water depth Helena Valley Tunnel Location: From a point 500 ft downstream from Canyon Ferry Dam westerly through the Spokane Hills to the Helena Valley Canal. Construction period: 1057-58 Length 13,085 ft Capacity 300 ftVs Cross section: Horseshoe Diameter 7 ft Lining: Concrete Pumping Plant Total Total dynamic Total Number capacity. head. horse- Designation of units ftVs ft power H...elena Valley 2 300 145 '10,000 'Direct-connected hydraulic turbine. 31.7 mi 350 ftVs 16 ft 2:1 5.6 ft 910 PSMBP. Helena Valley Unit % - I I '85 -o s a § - s a ■a > a o W 3 3 "J I Pick-Sloan Missouri Basin Program James Diversion Dam, Oahe Unit South Dakota: Brown and Spink Counties Upper Missouri Region Water and Power Resources Service The James Diversion Dam and Reservoir are located on the James River in east-central South Dakota, approx- imately 17 miles north of Huron.
You can download books for free in various formats, such as epub, pdf, azw, mobi, txt and others on book networks site. Additionally, the entire text is available for online reading through our e-reader. Our site is not responsible for the performance of third-party products (sites).
User Reviews: